Timeline: 7 days. Output: 6–8 pages, not a novella.
Interconnection sanity check (queue, study status, substation constraints, re-study risk) — 1 page.
Hardware reality check (turbine/BESS/switchgear lead times vs POs + escalation feasibility) — 1 page.
Protection/design red flags (one-line/three-line/relay philosophy; black-start & islanding gaps) — 1 page.
Critical path & cash burn (where days are bleeding; top 3 fixes) — 1 page.
Decision memo (proceed / pause / pivot with budget bands) — 1–2 pages.
60-min exec playback. That’s it. No photo-shoot slides, no academic appendix.
Timeline: 7 days. Output: 6–8 pages, not a novella.
Interconnection sanity check (queue, study status, substation constraints, re-study risk) — 1 page.
Hardware reality check (turbine/BESS/switchgear lead times vs POs + escalation feasibility) — 1 page.
Protection/design red flags (one-line/three-line/relay philosophy; black-start & islanding gaps) — 1 page.
Critical path & cash burn (where days are bleeding; top 3 fixes) — 1 page.
Decision memo (proceed / pause / pivot with budget bands) — 1–2 pages.
60-min exec playback. That’s it. No photo-shoot slides, no academic appendix.