Led $1.25B+ in OEM hardware RFPs, building 1,250 MWs of data-centre power platform, raised $2B+ in capital — and we’re just getting started.
Solutions
Compute-grade power for AI & data centers
We deliver megawatts, dates, and availability—not decks. Two tracks & an enabler:
Build — On-site hybrid generation (turbine + BESS), interconnection, and revenue ops.
Rescue — 7-day Triage Sprint to stop the bleed and pull forward hardware delivery.
Fund - Structure and place the capital stack for you: seed/DEV equity, project finance, and take-out investors so each megawatt is fully funded from first bolt to exit.
We De-Risk Power. You Deliver the Campus.
Utility speak, OEM slots, commissioning sequences—done. You get uptime and a tenant-ready story so you make sell/hold/build decisions faster.
For this service we charge a small base retainer and 5% of each week’s delay we eliminate, tied to your agreed weekly lost-revenue figure.
Assess - site review for power
-
Prove there’s a credible path to MW, dates, uptime—before big spend.
-
Constraint scan (POI/feeder/bank), AI load envelopes, on-site hybrid feasibility (turbine class + BESS hours), land/permitting reality.
-
Interconnection Outlook (2 pages), Hybrid Feasibility memo (2–3 pages), 90-day plan with ROM capex/opex bands.
-
Proceed to Scope or pivot.
Scope - to tenant signing
-
Freeze scope and dates so design + procurement run without thrash.
-
One-/three-line intent; protection philosophy; grounding/short-circuit envelopes; substation & switchgear major equipment list; telemetry/SCADA tags; BESS modes (grid-forming/following, droop, SoC strategy); parallel pathing plan (grid + on-site).
-
IInterconnection Playbook (milestones, realistic dates, risk register), Reference Design Brief (turbine/BESS, island/resync sequence), Procurement Lots Plan.
-
Approve Tenant Concept package.
Tenant Concept - tenant LOI
-
Win tenant confidence with an executable power plan finance and ops believe.
-
Tenant-facing brief (capacity, resilience N-1/N-2, uptime SLAs, timeline), critical-path de-risking (on-site + grid), commissioning outline, commercial bands (energy price, DR outline, ITC/bonus pathways).
-
Tenant Power Concept Pack (deck), Critical-Path Map (top 3 actions), Commercial Term Sheet (headline price bands, curtailment/availability language).
-
Tenant issues LOI / moves to diligence.
Tenant Signed
-
Convert LOI to signed terms while locking factory slots and utility windows. Get the site to shovel-ready and a a decision to proceed or sell.
-
Round-1 OEM escalations on up to 3 packages (turbine/switchgear/BESS), IA/FA negotiation support with workable outage windows, finalize SLAs + commissioning tests (black-start/resync), ITC documentation and metering spec.
-
Hardware Reality Sheets (confirmed dates + escalation log), IA/FA redlines (cost responsibility, curtailment, construction windows), bid-ready SOWs/lot specs.
-
Place POs; release EPC; move to Build.
Build
-
Construct fast without re-work; commission for real operations.
-
Owner’s Engineer on substation/switchgear; interface/change-control; FAT/SAT oversight; relay envelopes + breaker duty checks; telemetry integration; commissioning sequences (black-start, ride-through, synch-check); DR enrollment prep.
-
Build Readiness Pack; Commissioning Plan; Operations Playbook (v1).
-
Substantial completion → Operate.
Operate
-
Hit availability and revenue targets; keep tenant + utility happy.
-
Reliability governance, LTSA performance management, DR/ancillary dispatch support, continuous optimization (BESS cycles, heat-rate/starts).
-
Monthly SLA report; DR revenue report; Year-1 optimization plan.
-
Renew, expand, or handoff.
Triage - getting you back on track, fast.
Triage is the cheapest, highest-leverage week you’ll spend on the project. In 7 days we replace optimistic Gantt charts and vendor spin with a hard view of when real megawatts can land, what’s blocking them, and how many weeks you can actually pull forward. That alone can protect or create tens of millions in value before you spend another dollar or make another promise to a tenant or investor.
-
In one week we tell you, bluntly, whether your current plan is deliverable or fantasy.
We strip your programme back to first principles: where the MW come from, when the hardware can actually land, and what that means for COD. You get clarity fast enough to still do something about it. -
We map the true critical path to power from turbine or grid feed all the way to the rack.
That includes interconnection, generation, BESS/diesel, switchgear, transformers, permits, and OEM constraints. The output: a single, brutally honest view of what actually controls your go-live date. -
We validate your assumptions with current OEM lead times, factory capacity, and logistics constraints.
If your Gantt chart is pretending a 70-week turbine shows up in 40, we will call it out.
You get a realistic delivery envelope and options to pull dates forward, not just “risks noted” in a report. -
We stress-test your grid connection, permits, and regulatory position.
Where are the silent killers—studies, easements, environmental approvals, air/water consents—that can slip you 6–18 months?
We flag the real blockers, the decision-makers, and the escalation paths to keep the project moving. -
Using your numbers and our Weeks Saved → Deal Summary model, we put a dollar value on delay.
You’ll see exactly what each month of slippage costs in NPV, and what pulling COD forward by 8–24 weeks is worth to you and your investors. That’s the foundation for performance-linked fees and serious internal prioritisation. -
At the end of the week you get an exec-ready Triage Pack:
Clean critical path to power
Hardware and grid reality summary
3–4 credible delivery scenarios with dates and risk bands
Rationale for any capex or scope changes
It’s written so you can put it in front of a Board, IC, or tenant without translation.
-
Triage doesn’t just tell you “you’re in trouble” – it tells you what to do next.
We lay out clear options: rescue the current plan, re-scope around a different power solution, or cut your losses. Each option comes with indicative cost, time impact, and capital implications. -
If you choose to move ahead, we can stay on the field:
Lead OEM and EPC engagement
Lock hardware slots and structure hybrid generation/BESS
Package a capital-ready story for investors or tenants
Triage is the start of the relationship, not a report that dies in your inbox.