We measure results in megawatts, weeks saved, and capital closed.

Break Point exists to turn “stuck” into “delivered.” We’ve deregulated a national energy market, built a multi-hundred-megawatt data-centre power platform in Atlanta, and secured billions in capital for complex infrastructure. Below is a snapshot of what that looks like in hard numbers: MW delivered, weeks pulled forward, capex protected, and investors who come back.

By the numbers

  • $650m + $2bn+ capital secured
    Closed $650m with one capital partner and over $2bn with another for a single Atlanta power platform.

  • 750 MW + 500 MW hybrid generation scoped
    Designed large-scale gas + BESS hybrids to support hyperscale data-centre loads and 48-hour backup envelopes.

  • 96% repeat or referred work
    The vast majority of our engagements come from clients who bring us back or recommend us to their peers.

  • $1bn+ in US hardware and $200m+ in Europe run through RFPs
    Complex OEM and electrical hardware programmes delivered under budget and ahead of schedule.

  • Weeks – not months – to clarity
    Our 1-Week Triage has reset delivery expectations and decision-making on projects ranging from tens of MW to multi-hundred-MW campuses.— Quote Source

Power and projects we’ve moved

Deregulating a national energy market

  • Led the transition of a national electricity market from monopoly to deregulated.

  • Built the commercial structures that let utilities, regulators, and customers all move forward without blowing up the system.

  • Created the foundation that later underpinned large-scale EV and distributed energy programmes.

Designing large-scale hybrid generation

  • Built concepts for 750 MW and 500 MW hybrid plants blending turbines and BESS for primary and backup power.

  • Balanced capex, fuel cost, emissions, and resilience over realistic lead times rather than vendor fantasy.

  • Produced bankable technical/commercial narratives that capital providers can underwrite.

Rescuing programmes from “optimistic” schedules

  • Replaced heroic Gantt charts with a single, honest critical path to real megawatts.

  • Identified where interconnection, OEM lead times, and permitting would quietly add 9–18 months if left unchallenged.

  • Reset expectations with tenants, boards, and ICs before trust and value were permanently damaged.

Capital our work has unlocked

Multi-billion capital programmes
We’ve closed $650m with one capital partner and more than $2bn with another on a single Atlanta-based platform—because the story, the structure, and the delivery plan all held up under due diligence.

Bankable power stories, not pitch decks
Our work takes projects from “we think we can get there” to “here’s exactly how the MW, capex, risk profile, and schedule stack up.” That’s what lets investors move size and speed without feeling like they’re gambling.

From Triage to term sheet
For several clients, a 1-Week Triage has turned into:

  • A credible, compressed schedule

  • A coherent capex + opex profile

  • A capital-ready memo that answered IC questions before they were asked

The result: faster yes/no decisions and fewer “come back in six months when you know more” responses.